docs/evidence/gate-6/04b2faf47080aa7b5bce43b4319fa0276eb3da05/README.md

58e6347eeb72 · 1 KB

Gate 6 local evidence

Date: 2026-08-20

Candidate: 04b2faf47080aa7b5bce43b4319fa0276eb3da05

Status: Local application controls passed; staging operational proof pending

The exact committed candidate passed the owned baseline without retries:

  • mix precommit: passed
  • default Elixir tests: 1,267 passed; 9 cluster-tagged tests excluded
  • browser JavaScript tests: 17 passed
  • distributed Elixir tests: 9 passed
  • merged line coverage: 83.29%, above the enforced 83% floor
  • packaged production release build, readiness, migrations, startup, bounded health response, and graceful termination: passed against disposable PostgreSQL
  • Gate 6 migration rollback and forward rehearsal: passed

The retained baseline receipt is content-free and tied to the implementation SHA. The Gate 6 receipt records which controls this local evidence covers and which staging operations remain blocking.

No staging or production deployment occurred. This evidence does not claim the required staging credential rotation, load-balancer query suppression, or full-window staging log scan. Those checks remain mandatory before Gate 6 can close and before the Gate 15 candidate can be admitted.